Audit engine live in production — not a mock-up

Compliance is
a build step.

Every IFC version checked automatically — the way software teams run tests before a release. Applicant-side, IFC-native, and every verdict carries its own evidence.

WebGL 3D IFC4 Model Interactive
LIVE LASER SCANNER ACTIVE
Drag to rotate 3D view

01 — Problem

Code compliance is where
building projects stall.

The check is manual, the codes move faster than the engineers, and the cost lands on the applicant.

$75K soft-cost hit per residential project from permit delayNAHB estimate — $30–75K range
83% of developers name permit delay a top barrier to delivery
89% of Swedish permit applications arrive incomplete on first submission
3–5days of a senior engineer per document set, cross-checking codes by hand

02 — 3D Spatial Audit

IFC Geometry & Real-Time
Laser Scanning Plane.

Interactive 3D WebGL inspection engine. The elevation scanner plane passes continuously through architectural, structural, and MEP domain layers, evaluating building entity attributes in real time.

LASER SCANNING ENGINE: ELEVATION +14.200m (PASS 98%)
IFC Entities: 4,820 Rules Evaluated: 312

03 — Multi-Agent Consensus

18 Autonomous Reviewers &
Live Stream Audit.

Watch 18 domain-specialized AI reviewers stream proof-carrying verdicts directly into the submission document set in real time — forming structural consensus across all building codes.

RUN #218 · 18/18 AGENTS ACTIVE · 24 SECTIONS
3ms LATENCY
01
Fire Safety EI60 BBR 5:611 · PASS
02
Accessibility Route EN 17210 · 1350mm
03
Means of Egress BBR 5:321 · 27.4m
04
Structural Load EN 1991 · C3 Pass
05
Ramp Gradient BBR 3:146 · 1:11 CHECK
06
Acoustics Sound SS 25267 · 52dB
07
MEP Ventilation EN 13779 · 6.2 m/s
08
Daylight Glazing BBR 6:32 · DF 1.2%
09
Water & Drainage BBR 6:62 · Compliant
📄 Project_Alpha_IFC4_Submission_Set.gdoc LIVE AUDIT
CHAPTER 5 — FIRE & EGRESS COMPLIANCE SPECIFICATION
104 5.611 Fire Separation: All EI 60 rated walls shall extend continuously to slab undersides. PASS
105 17210 Accessible Corridor: Clear width measured along main route is 1350mm (Min 1200mm). PASS
106 3.146 Ramp Slopes: Ramp 3B gradient is 1:11 (8.9%). Landing length requires review. CHECK
107 5.321 Travel Distance: Maximum egress path length to safest stairwell: 27.4 meters. PASS
108 13779 Air Clearance: Duct velocity is 6.2 m/s; structural clearance 450mm maintained. PASS
109 Coverage Gate Status: 18/18 Domain Reviewers active · Coverage Gate 98%. GATE READY
10
Ceiling Clearance BBR 3:22 · 2700mm
11
Electrical Mains SS 4364000 · Verified
12
Moisture Barrier BBR 6:5 · Sealed
13
Elevators & Lifts EN 81-20 · Pass
14
Emergency Signs BBR 5:34 · Illuminated
15
Parking & EV PBL 8:9 · 20% Ready
16
Material Specs REACH · No Lead
17
Energy Performance EPBD · Class A+
18
BIM Provenance ISO 19650 · Proven

04 — Visual Collages

Multi-domain IFC Collages
& Evidence Layers.

From raw architectural CAD and IFC geometry to correlated rule execution. Every finding connects back to its precise source in the model.

BIM Model Audit Collage with 3D Wireframes and Blueprints
EN 17210
EI 60
Gradient

Full-Spectrum Building Audit Collage

Overlays live IFC data structures, 3D structural analysis, and municipal building codes onto unified compliance maps.

Multi-layer BIM Breakdown: Architecture, Structure, MEP
01 Architectural Render 02 Structural Steel Frame 03 MEP HVAC Piping

Cross-Domain Join Engine

Types joins across architecture, structural engineering, and MEP routing. Finds clashes and code violations before construction starts.

05 — Solution

Continuous integration
for buildings.

Two mechanisms make the verdict trustworthy. Both are patent pending.

Patent pending

Coverage Gate

Each mandatory check carries its own capability, evaluation and evidence state. A “ready” verdict is structurally impossible while any required row is uncovered — the tool cannot silently skip a rule.

Patent pending

Proof-carrying correlation

Cross-domain findings are typed joins over IFC entities with a provenance trail back to source facts — so a finding can be re-derived, not just trusted.

Replay

Bitemporal source closure

Codes move: national, state and municipal amendments land continuously. Any past review can be replayed against the rules as they stood on the submission date.

01IFC / PDF in
02Jurisdiction rule pack
0318 domain reviewers
04Coverage gate
05Evidence pack

06 — Proof

Validated on a real project.
Not a sandbox.

manual review 3–5 days
measured with BIM Grade 2–4 hours
  • 24 sections of documentation in scope, mandatory state review
  • Paid, externally-contracted project documentation — real client work
  • 3 U.S. provisional applications filed 19 Jul 2026 on the core mechanisms
  • Sweden first — BBR + PBL, applicant-side pre-submission — then DACH, then US

07 — Market

The category tipped.
Penetration is still ~2%.

Capital and regulation arrived in 2026; the installed base did not. That gap is the entry window.

≈2%of ~19,000 U.S. municipalities run any AI plan review
$54Mraised by PermitFlow — investors already priced the category
900Kmonthly users on UpCodes — the audience is already online
6mo→6dreview cycle compression reported by early-adopter cities

08 — Competition

Everyone owns one column.
Nobody owns the row.

“Upload a PDF and let AI find code violations” is a crowded lane. Neutral IFC plus jurisdiction replay is not.

Capability comparison against competing tools
Tool IFC-native Code corpus Applicant-side Cross-jurisdiction Provable coverage
Solibri / BIMcollab BIM QA, rules you author yourself ···
UpCodes / Helonic code content + PDF reading ···
Kestrel strong, but Revit-only ···
CodeComply / CivCheck sells to city halls, not firms ····
AiTech (SE) Sweden — municipality-facing ····
BIM Grade the whole row

Fragmentation is the moat — there is no single global building code, and that is exactly why a jurisdiction-replay engine compounds.

Check your next
submission set.

Applicant-side pre-submission review. Sweden (BBR + PBL) available now; DACH and US rule packs in build.